Home | Feasibility Report


Feasibility Report - Appendix D - Engineering

Habitat Restoration Preliminary Design
Phase 2 Stage 2 of the Hydrology and Geomorphology
Assessment in Support of the Feasibility Study

Report Text (318 k)

Appendices

Figures

  • Figure 1: Project Area and Surrounding Areas Managed by CDFG
  • Figure 2: Historic Marsh Outline (1856)
  • Figure 3: Initial Elevation and Years to Vegetation Establishment
  • Figure 4: Pond Bathymetry
  • Figure 5: Existing Conditions
  • Figure 6: Habitat Restoration Option 1: Habitat Goals
  • Figure 7: Habitat Restoration Option 2: Habitat Goals
  • Figure 8: Habitat Restoration Option 3: Habitat Goals
  • Figure 9: Habitat Restoration Option 4: Habitat Goals
  • Figure 10: Habitat Restoration Option 1: Mix of Tidal Marsh and Ponds
  • Figure 11: Habitat Restoration Option 2: Tidal Marsh Emphasis
  • Figure 12: Habitat Restoration Option 3: Pond Emphasis
  • Figure 13: Habitat Restoration Option 4: Accelerated Restoration
  • Figure 14: Schematic of Starter Channel and Berm
  • Figure 15: Habitat Areas, Options 1 and 2
  • Figure 16: Habitat Areas, Options 3 and 4
  • Figure 17: Habitat Evolution by Option
  • Figure 18: Habitat Restoration Option 1, Habitat at Year 5
  • Figure 19: Habitat Restoration Option 1, Habitat at Year 50
  • Figure 20: Habitat Restoration Option 1, Generalized Long-term Habitat
  • Figure 21: Schematic of Marsh Evolution
  • Figure 22: Evolution of Site Elevations and Habitats Over Time

Back to top