Home | DEIR | Feasibility Report


Feasibility Report and Technical Appendices

Text

Figures

  • Figure 1-1: Regional Location (pdf)
  • Figure 1-2: Project Area and Surrounding Areas Managed by DFG (pdf)
  • Figure 3-1: Existing Conditions (pdf)
  • Figure 4-1: Salinity Reduction Option 1A: Napa River and Napa Slough Discharge (pdf)
  • Figure 4-2: Salinity Reduction Option 1B: Napa River and Napa Slough Discharge and Breach of Pond 3 (pdf)
  • Figure 4-3: Salinity Reduction Option 1C: Napa River and Napa Slough Discharge with Breaches of Ponds 3 and 4/5 (pdf)
  • Figure 4-4: Salinity Reduction Option 2: Napa River and San Pablo Bay Discharge (pdf)
  • Figure 4-5: Habitat Restoration Option 1: Mixture of Ponds and Tidal Marsh (pdf)
  • Figure 4-6: Habitat Restoration Option 1: Habitat Endpoints (pdf)
  • Figure 4-7: Habitat Restoration Option 2: Tidal Marsh Emphasis (pdf)
  • Figure 4-8: Habitat Restoration Option 2: Habitat Endpoints (pdf)
  • Figure 4-9: Habitat Restoration Option 3: Pond Emphasis (pdf)
  • Figure 4-10: Habitat Restoration Option 3: Habitat Endpoints (pdf)
  • Figure 4-11: Habitat Restoration Option 4: Accelerated Restoration (pdf)
  • Figure 4-12: Habitat Restoration Option 4: Habitat Endpoints (pdf)
  • Figure 6-1: Recycled Water Delivery (pdf)
  • Figure 6-2: Recycled Water Supply and Salinity Reduction Period (pdf)

Appendices